Stormwater Drainage Investigation Areas – Moreton Bay Region
Planned stormwater drainage investigation areas in the Moreton Bay region, covering the Burpengary Creek, Caboolture River, Lower Pine River and Redcliffe catchments. For each area a caller gets the estimated land cost, asset cost and total establishment cost in dollars, and the footprint in square metres. Values are served per suburb for a single date, 8 March 2022.
Endpoint
Stormwater Drainage Investigation Areas – Moreton Bay Region
/v1/suburbs/{suburb_name}/datasets/stormwater-drainage-investigation-areas-moreton-bay5¢ per callServed by /v1/suburbs/{suburb_name}/datasets/{slug}, which documents every parameter, the response shape and errors, and has a live playground.
| Query parameter | Description |
|---|---|
fields | Comma-separated field slugs (below). Omit for all. |
from | First period to include: 2020, 2020-Q3, 2020-07 or 2020-07-01. |
to | Last period to include, same formats as `from`. |
curl -X GET 'https://api.microburbs.com.au/v1/suburbs/Burpengary/datasets/stormwater-drainage-investigation-areas-moreton-bay' \
-H 'Authorization: Bearer test'test is the public sandbox key: it works only for the sandbox's allowlisted suburbs and addresses. Use your own key for anything else.
About this dataset
12 suburbs in the Moreton Bay region of south-east Queensland, including Caboolture, Caboolture South, Burpengary, Morayfield, Joyner, Albany Creek, Highvale and Clear Mountain. It covers 15 investigation areas across four catchments: Burpengary Creek, Caboolture River, Lower Pine River and Redcliffe. There is one period, 8 March 2022. Current to 2022-03-08; refreshed One-off snapshot; updated only when the underlying plan is revised.. These figures are modelled estimates.
What it is
This dataset lists 15 stormwater drainage investigation areas that sit within a local government infrastructure plan for the Moreton Bay region. Each area has a code made of a catchment name and a number, such as Caboolture River CAB 073 or Redcliffe RED 031. For each one we hold an estimated land cost, an asset cost, a total establishment cost and the area footprint.
What it shows
It shows where future stormwater works such as detention basins, crossings and riverbank or runoff management are planned, and the dollar cost attached to each. Land cost is zero in every area, so the establishment cost is made up entirely of the asset cost. Costs range from nil to about 9.15 million dollars per area, and footprints range from about 2,500 m² to about 247,000 m².
Why use it
Analysts and developers can use it to see which suburbs have planned drainage infrastructure and how large the planned spend is. It helps with site due diligence, flood and runoff risk screening, and understanding infrastructure charges and growth-area investment. It is also useful context when reviewing development applications near these catchments.
How it is built
We take the investigation area records, which are mapped polygons with cost attributes, and attach each one to the suburb it falls in. Each value is stored as a single figure for the snapshot date, with one area code per field. Only 12 suburbs are covered, and each field holds a value for just one suburb, so most suburbs have no values for most fields.
Shortcomings
- Costs are planning estimates for works that may not have been built, not spending that has happened. They are in dollars of the plan's price basis, which is not stated, so do not compare them with current prices without adjusting.
- Land cost is zero in every area, and asset cost equals establishment cost in every area. A zero may mean land is not costed or is already held, not that no land is needed. Lower Pine River LPR 103 and LPR 104 have zero for all costs.
- Each field belongs to one named area code and holds a value for only one suburb. Areas that cross suburb boundaries may be attached to just one suburb, so summing by suburb will not give full coverage.
- The data is a single snapshot from March 2022 with no history, and the plan may have been amended since. Footprint figures are mapped polygon areas, not the size of the works themselves.
Fields
| Field | Unit | Description |
|---|---|---|
cost_land_burpengary_creek_bur_092Land cost – Burpengary Creek BUR 092 | AUD | Estimated land acquisition cost for drainage investigation area BUR 092 in the Burpengary Creek catchment; the value is zero. |
cost_land_redcliffe_red_031Land cost – Redcliffe RED 031 | AUD | Estimated land acquisition cost for drainage investigation area RED 031 in the Redcliffe catchment; the value is zero. |
cost_land_lower_pine_river_lpr_103Land cost – Lower Pine River LPR 103 | AUD | Estimated land acquisition cost for drainage investigation area LPR 103 in the Lower Pine River catchment; the value is zero. |
cost_land_lower_pine_river_lpr_104Land cost – Lower Pine River LPR 104 | AUD | Estimated land acquisition cost for drainage investigation area LPR 104 in the Lower Pine River catchment; the value is zero. |
cost_land_caboolture_river_cab_073Land cost – Caboolture River CAB 073 | AUD | Estimated land acquisition cost for drainage investigation area CAB 073 in the Caboolture River catchment; the value is zero. |
cost_land_caboolture_river_cab_074Land cost – Caboolture River CAB 074 | AUD | Estimated land acquisition cost for drainage investigation area CAB 074 in the Caboolture River catchment; the value is zero. |
cost_land_caboolture_river_cab_079Land cost – Caboolture River CAB 079 | AUD | Estimated land acquisition cost for drainage investigation area CAB 079 in the Caboolture River catchment; the value is zero. |
cost_land_lower_pine_river_lpr_105Land cost – Lower Pine River LPR 105 | AUD | Estimated land acquisition cost for drainage investigation area LPR 105 in the Lower Pine River catchment; the value is zero. |
cost_land_caboolture_river_cab_075Land cost – Caboolture River CAB 075 | AUD | Estimated land acquisition cost for drainage investigation area CAB 075 in the Caboolture River catchment; the value is zero. |
cost_land_caboolture_river_cab_078Land cost – Caboolture River CAB 078 | AUD | Estimated land acquisition cost for drainage investigation area CAB 078 in the Caboolture River catchment; the value is zero. |
cost_land_lower_pine_river_lpr_107Land cost – Lower Pine River LPR 107 | AUD | Estimated land acquisition cost for drainage investigation area LPR 107 in the Lower Pine River catchment; the value is zero. |
cost_land_burpengary_creek_bur_093Land cost – Burpengary Creek BUR 093 | AUD | Estimated land acquisition cost for drainage investigation area BUR 093 in the Burpengary Creek catchment; the value is zero. |
cost_land_caboolture_river_cab_076Land cost – Caboolture River CAB 076 | AUD | Estimated land acquisition cost for drainage investigation area CAB 076 in the Caboolture River catchment; the value is zero. |
cost_land_lower_pine_river_lpr_106Land cost – Lower Pine River LPR 106 | AUD | Estimated land acquisition cost for drainage investigation area LPR 106 in the Lower Pine River catchment; the value is zero. |
cost_land_redcliffe_red_033Land cost – Redcliffe RED 033 | AUD | Estimated land acquisition cost for drainage investigation area RED 033 in the Redcliffe catchment; the value is zero. |
cost_asset_burpengary_creek_bur_092Asset cost – Burpengary Creek BUR 092 | AUD | Estimated cost of the stormwater assets for area BUR 092 in the Burpengary Creek catchment, about 1.46 million dollars. |
cost_asset_redcliffe_red_031Asset cost – Redcliffe RED 031 | AUD | Estimated cost of the stormwater assets for area RED 031 in the Redcliffe catchment, about 3.03 million dollars. |
cost_asset_lower_pine_river_lpr_103Asset cost – Lower Pine River LPR 103 | AUD | Estimated cost of the stormwater assets for area LPR 103 in the Lower Pine River catchment; the value is zero. |
cost_asset_lower_pine_river_lpr_104Asset cost – Lower Pine River LPR 104 | AUD | Estimated cost of the stormwater assets for area LPR 104 in the Lower Pine River catchment; the value is zero. |
cost_asset_caboolture_river_cab_073Asset cost – Caboolture River CAB 073 | AUD | Estimated cost of the stormwater assets for area CAB 073 in the Caboolture River catchment, about 0.71 million dollars. |
cost_asset_caboolture_river_cab_074Asset cost – Caboolture River CAB 074 | AUD | Estimated cost of the stormwater assets for area CAB 074 in the Caboolture River catchment, about 3.10 million dollars. |
cost_asset_caboolture_river_cab_079Asset cost – Caboolture River CAB 079 | AUD | Estimated cost of the stormwater assets for area CAB 079 in the Caboolture River catchment, about 0.46 million dollars. |
cost_asset_lower_pine_river_lpr_105Asset cost – Lower Pine River LPR 105 | AUD | Estimated cost of the stormwater assets for area LPR 105 in the Lower Pine River catchment, about 1.83 million dollars. |
cost_asset_caboolture_river_cab_075Asset cost – Caboolture River CAB 075 | AUD | Estimated cost of the stormwater assets for area CAB 075 in the Caboolture River catchment, about 1.05 million dollars. |
cost_asset_caboolture_river_cab_078Asset cost – Caboolture River CAB 078 | AUD | Estimated cost of the stormwater assets for area CAB 078 in the Caboolture River catchment, about 1.14 million dollars. |
cost_asset_lower_pine_river_lpr_107Asset cost – Lower Pine River LPR 107 | AUD | Estimated cost of the stormwater assets for area LPR 107 in the Lower Pine River catchment, about 4.92 million dollars. |
cost_asset_burpengary_creek_bur_093Asset cost – Burpengary Creek BUR 093 | AUD | Estimated cost of the stormwater assets for area BUR 093 in the Burpengary Creek catchment, about 9.15 million dollars. |
cost_asset_caboolture_river_cab_076Asset cost – Caboolture River CAB 076 | AUD | Estimated cost of the stormwater assets for area CAB 076 in the Caboolture River catchment, about 0.95 million dollars. |
cost_asset_lower_pine_river_lpr_106Asset cost – Lower Pine River LPR 106 | AUD | Estimated cost of the stormwater assets for area LPR 106 in the Lower Pine River catchment, about 1.51 million dollars. |
cost_asset_redcliffe_red_033Asset cost – Redcliffe RED 033 | AUD | Estimated cost of the stormwater assets for area RED 033 in the Redcliffe catchment, about 6.71 million dollars. |
establishment_cost_burpengary_creek_bur_092Establishment cost – Burpengary Creek BUR 092 | AUD | Total estimated cost to establish drainage works in area BUR 092 (Burpengary Creek), about 1.46 million dollars. |
establishment_cost_redcliffe_red_031Establishment cost – Redcliffe RED 031 | AUD | Total estimated cost to establish drainage works in area RED 031 (Redcliffe), about 3.03 million dollars. |
establishment_cost_lower_pine_river_lpr_103Establishment cost – Lower Pine River LPR 103 | AUD | Total estimated cost to establish drainage works in area LPR 103 (Lower Pine River); the value is zero. |
establishment_cost_lower_pine_river_lpr_104Establishment cost – Lower Pine River LPR 104 | AUD | Total estimated cost to establish drainage works in area LPR 104 (Lower Pine River); the value is zero. |
establishment_cost_caboolture_river_cab_073Establishment cost – Caboolture River CAB 073 | AUD | Total estimated cost to establish drainage works in area CAB 073 (Caboolture River), about 0.71 million dollars. |
establishment_cost_caboolture_river_cab_074Establishment cost – Caboolture River CAB 074 | AUD | Total estimated cost to establish drainage works in area CAB 074 (Caboolture River), about 3.10 million dollars. |
establishment_cost_caboolture_river_cab_079Establishment cost – Caboolture River CAB 079 | AUD | Total estimated cost to establish drainage works in area CAB 079 (Caboolture River), about 0.46 million dollars. |
establishment_cost_lower_pine_river_lpr_105Establishment cost – Lower Pine River LPR 105 | AUD | Total estimated cost to establish drainage works in area LPR 105 (Lower Pine River), about 1.83 million dollars. |
establishment_cost_caboolture_river_cab_075Establishment cost – Caboolture River CAB 075 | AUD | Total estimated cost to establish drainage works in area CAB 075 (Caboolture River), about 1.05 million dollars. |
establishment_cost_caboolture_river_cab_078Establishment cost – Caboolture River CAB 078 | AUD | Total estimated cost to establish drainage works in area CAB 078 (Caboolture River), about 1.14 million dollars. |
establishment_cost_lower_pine_river_lpr_107Establishment cost – Lower Pine River LPR 107 | AUD | Total estimated cost to establish drainage works in area LPR 107 (Lower Pine River), about 4.92 million dollars. |
establishment_cost_burpengary_creek_bur_093Establishment cost – Burpengary Creek BUR 093 | AUD | Total estimated cost to establish drainage works in area BUR 093 (Burpengary Creek), about 9.15 million dollars. |
establishment_cost_caboolture_river_cab_076Establishment cost – Caboolture River CAB 076 | AUD | Total estimated cost to establish drainage works in area CAB 076 (Caboolture River), about 0.95 million dollars. |
establishment_cost_lower_pine_river_lpr_106Establishment cost – Lower Pine River LPR 106 | AUD | Total estimated cost to establish drainage works in area LPR 106 (Lower Pine River), about 1.51 million dollars. |
establishment_cost_redcliffe_red_033Establishment cost – Redcliffe RED 033 | AUD | Total estimated cost to establish drainage works in area RED 033 (Redcliffe), about 6.71 million dollars. |
shape_area_burpengary_creek_bur_092Area footprint – Burpengary Creek BUR 092 | m² | Mapped footprint of investigation area BUR 092 in the Burpengary Creek catchment, about 6,730 m². |
shape_area_redcliffe_red_031Area footprint – Redcliffe RED 031 | m² | Mapped footprint of investigation area RED 031 in the Redcliffe catchment, about 13,718 m². |
shape_area_lower_pine_river_lpr_103Area footprint – Lower Pine River LPR 103 | m² | Mapped footprint of investigation area LPR 103 in the Lower Pine River catchment, about 2,486 m². |
shape_area_lower_pine_river_lpr_104Area footprint – Lower Pine River LPR 104 | m² | Mapped footprint of investigation area LPR 104 in the Lower Pine River catchment, about 14,554 m². |
shape_area_caboolture_river_cab_073Area footprint – Caboolture River CAB 073 | m² | Mapped footprint of investigation area CAB 073 in the Caboolture River catchment, about 47,785 m². |
shape_area_caboolture_river_cab_074Area footprint – Caboolture River CAB 074 | m² | Mapped footprint of investigation area CAB 074 in the Caboolture River catchment, about 101,578 m². |
shape_area_caboolture_river_cab_079Area footprint – Caboolture River CAB 079 | m² | Mapped footprint of investigation area CAB 079 in the Caboolture River catchment, about 99,381 m². |
shape_area_lower_pine_river_lpr_105Area footprint – Lower Pine River LPR 105 | m² | Mapped footprint of investigation area LPR 105 in the Lower Pine River catchment, about 9,726 m². |
shape_area_caboolture_river_cab_075Area footprint – Caboolture River CAB 075 | m² | Mapped footprint of investigation area CAB 075 in the Caboolture River catchment, about 95,629 m². |
shape_area_caboolture_river_cab_078Area footprint – Caboolture River CAB 078 | m² | Mapped footprint of investigation area CAB 078 in the Caboolture River catchment, about 50,677 m². |
shape_area_lower_pine_river_lpr_107Area footprint – Lower Pine River LPR 107 | m² | Mapped footprint of investigation area LPR 107 in the Lower Pine River catchment, about 136,727 m². |
shape_area_burpengary_creek_bur_093Area footprint – Burpengary Creek BUR 093 | m² | Mapped footprint of investigation area BUR 093 in the Burpengary Creek catchment, about 127,910 m². |
shape_area_caboolture_river_cab_076Area footprint – Caboolture River CAB 076 | m² | Mapped footprint of investigation area CAB 076 in the Caboolture River catchment, about 199,664 m². |
shape_area_lower_pine_river_lpr_106Area footprint – Lower Pine River LPR 106 | m² | Mapped footprint of investigation area LPR 106 in the Lower Pine River catchment, about 246,758 m². |
shape_area_redcliffe_red_033Area footprint – Redcliffe RED 033 | m² | Mapped footprint of investigation area RED 033 in the Redcliffe catchment, about 99,965 m². |
shape_length_burpengary_creek_bur_092Shape Length – Burpengary Creek BUR 092 | m | Boundary length in metres of stormwater drainage investigation area BUR 092 in the Burpengary Creek catchment, which is 357.881 m in our data for 8 March 2022. |
shape_length_redcliffe_red_031Shape Length – Redcliffe RED 031 | m | Boundary length in metres of stormwater drainage investigation area RED 031 in the Redcliffe catchment, which is 571.5199 m in our data for 8 March 2022. |
shape_length_lower_pine_river_lpr_103Shape Length – Lower Pine River LPR 103 | m | Boundary length in metres of stormwater drainage investigation area LPR 103 in the Lower Pine River catchment, which is 288.2467 m in our data for 8 March 2022. |
shape_length_lower_pine_river_lpr_104Shape Length – Lower Pine River LPR 104 | m | Boundary length in metres of stormwater drainage investigation area LPR 104 in the Lower Pine River catchment, which is 726.3798 m in our data for 8 March 2022. |
shape_length_caboolture_river_cab_073Shape Length – Caboolture River CAB 073 | m | Boundary length in metres of stormwater drainage investigation area CAB 073 in the Caboolture River catchment, which is 890.2117 m in our data for 8 March 2022. |
shape_length_caboolture_river_cab_074Shape Length – Caboolture River CAB 074 | m | Boundary length in metres of stormwater drainage investigation area CAB 074 in the Caboolture River catchment, which is 1308.8446 m in our data for 8 March 2022. |
shape_length_caboolture_river_cab_079Shape Length – Caboolture River CAB 079 | m | Boundary length in metres of stormwater drainage investigation area CAB 079 in the Caboolture River catchment, which is 1270.2316 m in our data for 8 March 2022. |
shape_length_lower_pine_river_lpr_105Shape Length – Lower Pine River LPR 105 | m | Boundary length in metres of stormwater drainage investigation area LPR 105 in the Lower Pine River catchment, which is 502.6248 m in our data for 8 March 2022. |
shape_length_caboolture_river_cab_075Shape Length – Caboolture River CAB 075 | m | Boundary length in metres of stormwater drainage investigation area CAB 075 in the Caboolture River catchment, which is 1284.1149 m in our data for 8 March 2022. |
shape_length_caboolture_river_cab_078Shape Length – Caboolture River CAB 078 | m | Boundary length in metres of stormwater drainage investigation area CAB 078 in the Caboolture River catchment, which is 928.1228 m in our data for 8 March 2022. |
shape_length_lower_pine_river_lpr_107Shape Length – Lower Pine River LPR 107 | m | Boundary length in metres of stormwater drainage investigation area LPR 107 in the Lower Pine River catchment, which is 2207.735 m in our data for 8 March 2022. |
shape_length_burpengary_creek_bur_093Shape Length – Burpengary Creek BUR 093 | m | Boundary length in metres of stormwater drainage investigation area BUR 093 in the Burpengary Creek catchment, which is 2731.8126 m in our data for 8 March 2022. |
shape_length_caboolture_river_cab_076Shape Length – Caboolture River CAB 076 | m | Boundary length in metres of stormwater drainage investigation area CAB 076 in the Caboolture River catchment, which is 1739.2369 m in our data for 8 March 2022. |
shape_length_lower_pine_river_lpr_106Shape Length – Lower Pine River LPR 106 | m | Boundary length in metres of stormwater drainage investigation area LPR 106 in the Lower Pine River catchment, which is 1982.988 m in our data for 8 March 2022. |
shape_length_redcliffe_red_033Shape Length – Redcliffe RED 033 | m | Boundary length in metres of stormwater drainage investigation area RED 033 in the Redcliffe catchment, which is 2709.6636 m in our data for 8 March 2022. |