MicroburbsMicroburbs
Free sandbox: try any request below on the sample suburbs, no signup. For every suburb, create an API key.
Classic docs
Microburbs Property Data API
Dataset · Planning

Stormwater Drainage Investigation Areas – Moreton Bay Region

Planned stormwater drainage investigation areas in the Moreton Bay region, covering the Burpengary Creek, Caboolture River, Lower Pine River and Redcliffe catchments. For each area a caller gets the estimated land cost, asset cost and total establishment cost in dollars, and the footprint in square metres. Values are served per suburb for a single date, 8 March 2022.

Endpoint

Stormwater Drainage Investigation Areas – Moreton Bay Region

GET/v1/suburbs/{suburb_name}/datasets/stormwater-drainage-investigation-areas-moreton-bay5¢ per call

Served by /v1/suburbs/{suburb_name}/datasets/{slug}, which documents every parameter, the response shape and errors, and has a live playground.

Query parameterDescription
fieldsComma-separated field slugs (below). Omit for all.
fromFirst period to include: 2020, 2020-Q3, 2020-07 or 2020-07-01.
toLast period to include, same formats as `from`.
curl -X GET 'https://api.microburbs.com.au/v1/suburbs/Burpengary/datasets/stormwater-drainage-investigation-areas-moreton-bay' \
  -H 'Authorization: Bearer test'

test is the public sandbox key: it works only for the sandbox's allowlisted suburbs and addresses. Use your own key for anything else.

About this dataset

12 suburbs in the Moreton Bay region of south-east Queensland, including Caboolture, Caboolture South, Burpengary, Morayfield, Joyner, Albany Creek, Highvale and Clear Mountain. It covers 15 investigation areas across four catchments: Burpengary Creek, Caboolture River, Lower Pine River and Redcliffe. There is one period, 8 March 2022. Current to 2022-03-08; refreshed One-off snapshot; updated only when the underlying plan is revised.. These figures are modelled estimates.

What it is

This dataset lists 15 stormwater drainage investigation areas that sit within a local government infrastructure plan for the Moreton Bay region. Each area has a code made of a catchment name and a number, such as Caboolture River CAB 073 or Redcliffe RED 031. For each one we hold an estimated land cost, an asset cost, a total establishment cost and the area footprint.

What it shows

It shows where future stormwater works such as detention basins, crossings and riverbank or runoff management are planned, and the dollar cost attached to each. Land cost is zero in every area, so the establishment cost is made up entirely of the asset cost. Costs range from nil to about 9.15 million dollars per area, and footprints range from about 2,500 m² to about 247,000 m².

Why use it

Analysts and developers can use it to see which suburbs have planned drainage infrastructure and how large the planned spend is. It helps with site due diligence, flood and runoff risk screening, and understanding infrastructure charges and growth-area investment. It is also useful context when reviewing development applications near these catchments.

How it is built

We take the investigation area records, which are mapped polygons with cost attributes, and attach each one to the suburb it falls in. Each value is stored as a single figure for the snapshot date, with one area code per field. Only 12 suburbs are covered, and each field holds a value for just one suburb, so most suburbs have no values for most fields.

Shortcomings

  • Costs are planning estimates for works that may not have been built, not spending that has happened. They are in dollars of the plan's price basis, which is not stated, so do not compare them with current prices without adjusting.
  • Land cost is zero in every area, and asset cost equals establishment cost in every area. A zero may mean land is not costed or is already held, not that no land is needed. Lower Pine River LPR 103 and LPR 104 have zero for all costs.
  • Each field belongs to one named area code and holds a value for only one suburb. Areas that cross suburb boundaries may be attached to just one suburb, so summing by suburb will not give full coverage.
  • The data is a single snapshot from March 2022 with no history, and the plan may have been amended since. Footprint figures are mapped polygon areas, not the size of the works themselves.

Fields

FieldUnitDescription
cost_land_burpengary_creek_bur_092
Land cost – Burpengary Creek BUR 092
AUDEstimated land acquisition cost for drainage investigation area BUR 092 in the Burpengary Creek catchment; the value is zero.
cost_land_redcliffe_red_031
Land cost – Redcliffe RED 031
AUDEstimated land acquisition cost for drainage investigation area RED 031 in the Redcliffe catchment; the value is zero.
cost_land_lower_pine_river_lpr_103
Land cost – Lower Pine River LPR 103
AUDEstimated land acquisition cost for drainage investigation area LPR 103 in the Lower Pine River catchment; the value is zero.
cost_land_lower_pine_river_lpr_104
Land cost – Lower Pine River LPR 104
AUDEstimated land acquisition cost for drainage investigation area LPR 104 in the Lower Pine River catchment; the value is zero.
cost_land_caboolture_river_cab_073
Land cost – Caboolture River CAB 073
AUDEstimated land acquisition cost for drainage investigation area CAB 073 in the Caboolture River catchment; the value is zero.
cost_land_caboolture_river_cab_074
Land cost – Caboolture River CAB 074
AUDEstimated land acquisition cost for drainage investigation area CAB 074 in the Caboolture River catchment; the value is zero.
cost_land_caboolture_river_cab_079
Land cost – Caboolture River CAB 079
AUDEstimated land acquisition cost for drainage investigation area CAB 079 in the Caboolture River catchment; the value is zero.
cost_land_lower_pine_river_lpr_105
Land cost – Lower Pine River LPR 105
AUDEstimated land acquisition cost for drainage investigation area LPR 105 in the Lower Pine River catchment; the value is zero.
cost_land_caboolture_river_cab_075
Land cost – Caboolture River CAB 075
AUDEstimated land acquisition cost for drainage investigation area CAB 075 in the Caboolture River catchment; the value is zero.
cost_land_caboolture_river_cab_078
Land cost – Caboolture River CAB 078
AUDEstimated land acquisition cost for drainage investigation area CAB 078 in the Caboolture River catchment; the value is zero.
cost_land_lower_pine_river_lpr_107
Land cost – Lower Pine River LPR 107
AUDEstimated land acquisition cost for drainage investigation area LPR 107 in the Lower Pine River catchment; the value is zero.
cost_land_burpengary_creek_bur_093
Land cost – Burpengary Creek BUR 093
AUDEstimated land acquisition cost for drainage investigation area BUR 093 in the Burpengary Creek catchment; the value is zero.
cost_land_caboolture_river_cab_076
Land cost – Caboolture River CAB 076
AUDEstimated land acquisition cost for drainage investigation area CAB 076 in the Caboolture River catchment; the value is zero.
cost_land_lower_pine_river_lpr_106
Land cost – Lower Pine River LPR 106
AUDEstimated land acquisition cost for drainage investigation area LPR 106 in the Lower Pine River catchment; the value is zero.
cost_land_redcliffe_red_033
Land cost – Redcliffe RED 033
AUDEstimated land acquisition cost for drainage investigation area RED 033 in the Redcliffe catchment; the value is zero.
cost_asset_burpengary_creek_bur_092
Asset cost – Burpengary Creek BUR 092
AUDEstimated cost of the stormwater assets for area BUR 092 in the Burpengary Creek catchment, about 1.46 million dollars.
cost_asset_redcliffe_red_031
Asset cost – Redcliffe RED 031
AUDEstimated cost of the stormwater assets for area RED 031 in the Redcliffe catchment, about 3.03 million dollars.
cost_asset_lower_pine_river_lpr_103
Asset cost – Lower Pine River LPR 103
AUDEstimated cost of the stormwater assets for area LPR 103 in the Lower Pine River catchment; the value is zero.
cost_asset_lower_pine_river_lpr_104
Asset cost – Lower Pine River LPR 104
AUDEstimated cost of the stormwater assets for area LPR 104 in the Lower Pine River catchment; the value is zero.
cost_asset_caboolture_river_cab_073
Asset cost – Caboolture River CAB 073
AUDEstimated cost of the stormwater assets for area CAB 073 in the Caboolture River catchment, about 0.71 million dollars.
cost_asset_caboolture_river_cab_074
Asset cost – Caboolture River CAB 074
AUDEstimated cost of the stormwater assets for area CAB 074 in the Caboolture River catchment, about 3.10 million dollars.
cost_asset_caboolture_river_cab_079
Asset cost – Caboolture River CAB 079
AUDEstimated cost of the stormwater assets for area CAB 079 in the Caboolture River catchment, about 0.46 million dollars.
cost_asset_lower_pine_river_lpr_105
Asset cost – Lower Pine River LPR 105
AUDEstimated cost of the stormwater assets for area LPR 105 in the Lower Pine River catchment, about 1.83 million dollars.
cost_asset_caboolture_river_cab_075
Asset cost – Caboolture River CAB 075
AUDEstimated cost of the stormwater assets for area CAB 075 in the Caboolture River catchment, about 1.05 million dollars.
cost_asset_caboolture_river_cab_078
Asset cost – Caboolture River CAB 078
AUDEstimated cost of the stormwater assets for area CAB 078 in the Caboolture River catchment, about 1.14 million dollars.
cost_asset_lower_pine_river_lpr_107
Asset cost – Lower Pine River LPR 107
AUDEstimated cost of the stormwater assets for area LPR 107 in the Lower Pine River catchment, about 4.92 million dollars.
cost_asset_burpengary_creek_bur_093
Asset cost – Burpengary Creek BUR 093
AUDEstimated cost of the stormwater assets for area BUR 093 in the Burpengary Creek catchment, about 9.15 million dollars.
cost_asset_caboolture_river_cab_076
Asset cost – Caboolture River CAB 076
AUDEstimated cost of the stormwater assets for area CAB 076 in the Caboolture River catchment, about 0.95 million dollars.
cost_asset_lower_pine_river_lpr_106
Asset cost – Lower Pine River LPR 106
AUDEstimated cost of the stormwater assets for area LPR 106 in the Lower Pine River catchment, about 1.51 million dollars.
cost_asset_redcliffe_red_033
Asset cost – Redcliffe RED 033
AUDEstimated cost of the stormwater assets for area RED 033 in the Redcliffe catchment, about 6.71 million dollars.
establishment_cost_burpengary_creek_bur_092
Establishment cost – Burpengary Creek BUR 092
AUDTotal estimated cost to establish drainage works in area BUR 092 (Burpengary Creek), about 1.46 million dollars.
establishment_cost_redcliffe_red_031
Establishment cost – Redcliffe RED 031
AUDTotal estimated cost to establish drainage works in area RED 031 (Redcliffe), about 3.03 million dollars.
establishment_cost_lower_pine_river_lpr_103
Establishment cost – Lower Pine River LPR 103
AUDTotal estimated cost to establish drainage works in area LPR 103 (Lower Pine River); the value is zero.
establishment_cost_lower_pine_river_lpr_104
Establishment cost – Lower Pine River LPR 104
AUDTotal estimated cost to establish drainage works in area LPR 104 (Lower Pine River); the value is zero.
establishment_cost_caboolture_river_cab_073
Establishment cost – Caboolture River CAB 073
AUDTotal estimated cost to establish drainage works in area CAB 073 (Caboolture River), about 0.71 million dollars.
establishment_cost_caboolture_river_cab_074
Establishment cost – Caboolture River CAB 074
AUDTotal estimated cost to establish drainage works in area CAB 074 (Caboolture River), about 3.10 million dollars.
establishment_cost_caboolture_river_cab_079
Establishment cost – Caboolture River CAB 079
AUDTotal estimated cost to establish drainage works in area CAB 079 (Caboolture River), about 0.46 million dollars.
establishment_cost_lower_pine_river_lpr_105
Establishment cost – Lower Pine River LPR 105
AUDTotal estimated cost to establish drainage works in area LPR 105 (Lower Pine River), about 1.83 million dollars.
establishment_cost_caboolture_river_cab_075
Establishment cost – Caboolture River CAB 075
AUDTotal estimated cost to establish drainage works in area CAB 075 (Caboolture River), about 1.05 million dollars.
establishment_cost_caboolture_river_cab_078
Establishment cost – Caboolture River CAB 078
AUDTotal estimated cost to establish drainage works in area CAB 078 (Caboolture River), about 1.14 million dollars.
establishment_cost_lower_pine_river_lpr_107
Establishment cost – Lower Pine River LPR 107
AUDTotal estimated cost to establish drainage works in area LPR 107 (Lower Pine River), about 4.92 million dollars.
establishment_cost_burpengary_creek_bur_093
Establishment cost – Burpengary Creek BUR 093
AUDTotal estimated cost to establish drainage works in area BUR 093 (Burpengary Creek), about 9.15 million dollars.
establishment_cost_caboolture_river_cab_076
Establishment cost – Caboolture River CAB 076
AUDTotal estimated cost to establish drainage works in area CAB 076 (Caboolture River), about 0.95 million dollars.
establishment_cost_lower_pine_river_lpr_106
Establishment cost – Lower Pine River LPR 106
AUDTotal estimated cost to establish drainage works in area LPR 106 (Lower Pine River), about 1.51 million dollars.
establishment_cost_redcliffe_red_033
Establishment cost – Redcliffe RED 033
AUDTotal estimated cost to establish drainage works in area RED 033 (Redcliffe), about 6.71 million dollars.
shape_area_burpengary_creek_bur_092
Area footprint – Burpengary Creek BUR 092
m²Mapped footprint of investigation area BUR 092 in the Burpengary Creek catchment, about 6,730 m².
shape_area_redcliffe_red_031
Area footprint – Redcliffe RED 031
m²Mapped footprint of investigation area RED 031 in the Redcliffe catchment, about 13,718 m².
shape_area_lower_pine_river_lpr_103
Area footprint – Lower Pine River LPR 103
m²Mapped footprint of investigation area LPR 103 in the Lower Pine River catchment, about 2,486 m².
shape_area_lower_pine_river_lpr_104
Area footprint – Lower Pine River LPR 104
m²Mapped footprint of investigation area LPR 104 in the Lower Pine River catchment, about 14,554 m².
shape_area_caboolture_river_cab_073
Area footprint – Caboolture River CAB 073
m²Mapped footprint of investigation area CAB 073 in the Caboolture River catchment, about 47,785 m².
shape_area_caboolture_river_cab_074
Area footprint – Caboolture River CAB 074
m²Mapped footprint of investigation area CAB 074 in the Caboolture River catchment, about 101,578 m².
shape_area_caboolture_river_cab_079
Area footprint – Caboolture River CAB 079
m²Mapped footprint of investigation area CAB 079 in the Caboolture River catchment, about 99,381 m².
shape_area_lower_pine_river_lpr_105
Area footprint – Lower Pine River LPR 105
m²Mapped footprint of investigation area LPR 105 in the Lower Pine River catchment, about 9,726 m².
shape_area_caboolture_river_cab_075
Area footprint – Caboolture River CAB 075
m²Mapped footprint of investigation area CAB 075 in the Caboolture River catchment, about 95,629 m².
shape_area_caboolture_river_cab_078
Area footprint – Caboolture River CAB 078
m²Mapped footprint of investigation area CAB 078 in the Caboolture River catchment, about 50,677 m².
shape_area_lower_pine_river_lpr_107
Area footprint – Lower Pine River LPR 107
m²Mapped footprint of investigation area LPR 107 in the Lower Pine River catchment, about 136,727 m².
shape_area_burpengary_creek_bur_093
Area footprint – Burpengary Creek BUR 093
m²Mapped footprint of investigation area BUR 093 in the Burpengary Creek catchment, about 127,910 m².
shape_area_caboolture_river_cab_076
Area footprint – Caboolture River CAB 076
m²Mapped footprint of investigation area CAB 076 in the Caboolture River catchment, about 199,664 m².
shape_area_lower_pine_river_lpr_106
Area footprint – Lower Pine River LPR 106
m²Mapped footprint of investigation area LPR 106 in the Lower Pine River catchment, about 246,758 m².
shape_area_redcliffe_red_033
Area footprint – Redcliffe RED 033
m²Mapped footprint of investigation area RED 033 in the Redcliffe catchment, about 99,965 m².
shape_length_burpengary_creek_bur_092
Shape Length – Burpengary Creek BUR 092
mBoundary length in metres of stormwater drainage investigation area BUR 092 in the Burpengary Creek catchment, which is 357.881 m in our data for 8 March 2022.
shape_length_redcliffe_red_031
Shape Length – Redcliffe RED 031
mBoundary length in metres of stormwater drainage investigation area RED 031 in the Redcliffe catchment, which is 571.5199 m in our data for 8 March 2022.
shape_length_lower_pine_river_lpr_103
Shape Length – Lower Pine River LPR 103
mBoundary length in metres of stormwater drainage investigation area LPR 103 in the Lower Pine River catchment, which is 288.2467 m in our data for 8 March 2022.
shape_length_lower_pine_river_lpr_104
Shape Length – Lower Pine River LPR 104
mBoundary length in metres of stormwater drainage investigation area LPR 104 in the Lower Pine River catchment, which is 726.3798 m in our data for 8 March 2022.
shape_length_caboolture_river_cab_073
Shape Length – Caboolture River CAB 073
mBoundary length in metres of stormwater drainage investigation area CAB 073 in the Caboolture River catchment, which is 890.2117 m in our data for 8 March 2022.
shape_length_caboolture_river_cab_074
Shape Length – Caboolture River CAB 074
mBoundary length in metres of stormwater drainage investigation area CAB 074 in the Caboolture River catchment, which is 1308.8446 m in our data for 8 March 2022.
shape_length_caboolture_river_cab_079
Shape Length – Caboolture River CAB 079
mBoundary length in metres of stormwater drainage investigation area CAB 079 in the Caboolture River catchment, which is 1270.2316 m in our data for 8 March 2022.
shape_length_lower_pine_river_lpr_105
Shape Length – Lower Pine River LPR 105
mBoundary length in metres of stormwater drainage investigation area LPR 105 in the Lower Pine River catchment, which is 502.6248 m in our data for 8 March 2022.
shape_length_caboolture_river_cab_075
Shape Length – Caboolture River CAB 075
mBoundary length in metres of stormwater drainage investigation area CAB 075 in the Caboolture River catchment, which is 1284.1149 m in our data for 8 March 2022.
shape_length_caboolture_river_cab_078
Shape Length – Caboolture River CAB 078
mBoundary length in metres of stormwater drainage investigation area CAB 078 in the Caboolture River catchment, which is 928.1228 m in our data for 8 March 2022.
shape_length_lower_pine_river_lpr_107
Shape Length – Lower Pine River LPR 107
mBoundary length in metres of stormwater drainage investigation area LPR 107 in the Lower Pine River catchment, which is 2207.735 m in our data for 8 March 2022.
shape_length_burpengary_creek_bur_093
Shape Length – Burpengary Creek BUR 093
mBoundary length in metres of stormwater drainage investigation area BUR 093 in the Burpengary Creek catchment, which is 2731.8126 m in our data for 8 March 2022.
shape_length_caboolture_river_cab_076
Shape Length – Caboolture River CAB 076
mBoundary length in metres of stormwater drainage investigation area CAB 076 in the Caboolture River catchment, which is 1739.2369 m in our data for 8 March 2022.
shape_length_lower_pine_river_lpr_106
Shape Length – Lower Pine River LPR 106
mBoundary length in metres of stormwater drainage investigation area LPR 106 in the Lower Pine River catchment, which is 1982.988 m in our data for 8 March 2022.
shape_length_redcliffe_red_033
Shape Length – Redcliffe RED 033
mBoundary length in metres of stormwater drainage investigation area RED 033 in the Redcliffe catchment, which is 2709.6636 m in our data for 8 March 2022.