Stormwater Catchments – Redcliffe Peninsula and Moreton Bay (Priority Infrastructure Plan)
Polygon boundaries of eight named stormwater catchments in the Redcliffe area of Moreton Bay, Queensland, taken from a priority infrastructure plan. A caller gets each catchment's name and rule identifier, either by suburb as GeoJSON or for catchments near an address.
Endpoints
Stormwater Catchments – Redcliffe Peninsula and Moreton Bay (Priority Infrastructure Plan) (map)
/v1/suburbs/{suburb_name}/layers/stormwater-catchments-redcliffe-moreton-bay10¢ per callServed by /v1/suburbs/{suburb_name}/layers/{slug}, which documents every parameter, the response shape and errors, and has a live playground.
| Query parameter | Description |
|---|---|
fields | Comma-separated field slugs (below). Omit for all. |
limit | Features per page, 1 to 500 (default 200). |
offset | Items to skip, for the next page (`next_offset`). |
curl -X GET 'https://api.microburbs.com.au/v1/suburbs/Redcliffe%20%28Qld%29/layers/stormwater-catchments-redcliffe-moreton-bay' \
-H 'Authorization: Bearer test'test is the public sandbox key: it works only for the sandbox's allowlisted suburbs and addresses. Use your own key for anything else.
Stormwater Catchments – Redcliffe Peninsula and Moreton Bay (Priority Infrastructure Plan) nearby
/v1/properties/{gnaf_id}/layers/stormwater-catchments-redcliffe-moreton-bay/nearby10¢ per callServed by /v1/properties/{gnaf_id}/layers/{slug}/nearby, which documents every parameter, the response shape and errors, and has a live playground.
| Query parameter | Description |
|---|---|
radius_m | Search radius in metres, 1 to 2000 (default 500). |
fields | Comma-separated field slugs (below). Omit for all. |
limit | Features per page, 1 to 500 (default 200). |
offset | Items to skip, for the next page (`next_offset`). |
curl -X GET 'https://api.microburbs.com.au/v1/properties/GAQLD163295159/layers/stormwater-catchments-redcliffe-moreton-bay/nearby' \
-H 'Authorization: Bearer test'test is the public sandbox key: it works only for the sandbox's allowlisted suburbs and addresses. Use your own key for anything else.
About this dataset
Eight catchment polygons in the Redcliffe Peninsula and surrounding Moreton Bay area, Queensland. They span roughly longitude 153.03 to 153.12 and latitude -27.26 to -27.19. Suburbs include Clontarf, Deception Bay, Kippa-Ring, Mango Hill, Margate, Newport, North Lakes, Redcliffe, Rothwell and Scarborough. The record timestamp is 26 September 2025. Current to 2026-06-25; refreshed As published; no regular update schedule is known..
What it is
A map layer of eight stormwater catchment polygons used in infrastructure planning for the Redcliffe area. Each feature carries the catchment name, such as Saltwater Creek, Scarborough Coastal, Margate Balance or Humpybong Creek, and a rule identifier.
What it shows
It shows which stormwater catchment a location falls in, and where the catchment boundaries run across the peninsula and nearby suburbs. It does not show pipe networks, flood levels or drainage capacity.
Why use it
Stormwater catchments determine which drainage network serves a site. Developers, planners and analysts use them to find the catchment for a property, assess infrastructure planning context and group sites by drainage area.
How it is built
We store the catchment boundaries as polygons and serve them in two ways: per suburb as GeoJSON, and as features near an address. Suburb calls simplify the polygons to about 5 metres, while nearby calls return full detail. All eight features fall within a suburb in our coverage. The layer covers only the Redcliffe area, so it has no coverage elsewhere.
Shortcomings
- Only eight features, covering one part of Moreton Bay, so it is not a general stormwater dataset for Queensland.
- Suburb calls simplify boundaries to about 5 metres, so use nearby calls when precise edges matter.
- The rule identifier is 1 for every feature, so it does not separate catchments. Use the name instead.
- The layer comes from an infrastructure planning document and may not reflect current drainage works or later planning scheme changes. It has no attributes for capacity or flood risk.
Fields
| Field | Unit | Description |
|---|---|---|
nameCatchment name | Name of the stormwater catchment, for example Saltwater Creek, Scarborough Coastal, Margate Balance or Humpybong Creek. | |
rule_idRule ID | Integer rule identifier attached to the catchment; it is 1 for all eight features. |
