Statutory Infrastructure Provider Anticipatory Notice, Foley Village, Hilton WA
A single map polygon marking the Foley Village project area in Hilton, Western Australia, where Interphone Pty Ltd gave an anticipatory notice as a statutory infrastructure provider (SIP). Each feature carries the provider name, notice type, contract summary, network technology (FTTB, vectored) and estimated completion date.
Endpoints
Statutory Infrastructure Provider Anticipatory Notice, Foley Village, Hilton WA (map)
/v1/suburbs/{suburb_name}/layers/sip-anticipatory-notice-foley-village-hilton-wa10¢ per callServed by /v1/suburbs/{suburb_name}/layers/{slug}, which documents every parameter, the response shape and errors, and has a live playground.
| Query parameter | Description |
|---|---|
fields | Comma-separated field slugs (below). Omit for all. |
limit | Features per page, 1 to 500 (default 200). |
offset | Items to skip, for the next page (`next_offset`). |
curl -X GET 'https://api.microburbs.com.au/v1/suburbs/Hilton%20%28WA%29/layers/sip-anticipatory-notice-foley-village-hilton-wa' \
-H 'Authorization: Bearer test'test is the public sandbox key: it works only for the sandbox's allowlisted suburbs and addresses. Use your own key for anything else.
Statutory Infrastructure Provider Anticipatory Notice, Foley Village, Hilton WA nearby
/v1/properties/{gnaf_id}/layers/sip-anticipatory-notice-foley-village-hilton-wa/nearby10¢ per callServed by /v1/properties/{gnaf_id}/layers/{slug}/nearby, which documents every parameter, the response shape and errors, and has a live playground.
| Query parameter | Description |
|---|---|
radius_m | Search radius in metres, 1 to 2000 (default 500). |
fields | Comma-separated field slugs (below). Omit for all. |
limit | Features per page, 1 to 500 (default 200). |
offset | Items to skip, for the next page (`next_offset`). |
curl -X GET 'https://api.microburbs.com.au/v1/properties/GAWA_162696085/layers/sip-anticipatory-notice-foley-village-hilton-wa/nearby' \
-H 'Authorization: Bearer test'test is the public sandbox key: it works only for the sandbox's allowlisted suburbs and addresses. Use your own key for anything else.
About this dataset
Hilton, Western Australia (postcode 6163), in the Foley Village project area only. The layer has 1 feature, and its bounds are about 115.7879 to 115.7911 longitude and -32.0747 to -32.0732 latitude. The notice dates from October 2021, and records start from 3 November 2021. Current to 2022-04-26; refreshed One-off. The record was last modified in April 2022, and there is no regular update schedule..
What it is
A polygon layer showing the area covered by one anticipatory notice for telecommunications network infrastructure. The notice was given on 28 October 2021 under a contract dated 18 October 2021. It covers the Foley Village project area in Hilton WA 6163.
What it shows
It shows the footprint of the project area, the SIP responsible, the type of network to be installed (fibre to the basement, vectored) and the estimated completion date of 31 January 2022. It also carries a short contract description.
Why use it
It helps analysts and agents judge which broadband provider and technology apply to a development or address in Foley Village. It is useful for property due diligence, because it shows how a site is expected to be connected to fixed-line broadband.
How it is built
We hold the notice as one polygon with text attributes. Suburb requests return the feature as GeoJSON, with lines and polygons simplified to about 5 metres. Nearby-address requests return full detail. The layer has one feature and covers nothing beyond this project area.
Shortcomings
- It holds only one notice, so it says nothing about broadband provision elsewhere in Hilton or Western Australia.
- The completion date (31 January 2022) was an estimate. The layer does not confirm that the network was delivered or when.
- The notice dates from 2021 and has not been updated since April 2022. Current service availability may differ.
- The estimated completion date is stored as text in a month-day-year format (01-31-22), so parse it before using it as a date.
Fields
| Field | Unit | Description |
|---|---|---|
name_of_sipName of SIP | Name of the statutory infrastructure provider that gave the notice, here Interphone Pty Ltd. | |
service_areaService area type | Type of service area record, here an Anticipatory Notice. | |
service_area_identifierService area identifier | Name that identifies the service area, here Foley Village. | |
contractContract description | Text summary of the contract under which the provider is to supply network infrastructure, which is a real estate development contract. | |
project_areaProject area | Address-style description of the project area, here Foley Village, Hilton WA 6163. | |
network_infrastructureNetwork infrastructure | Type of network to be installed, here FTTB (vectored), meaning fibre to the basement. | |
estimated_completion_dateEstimated completion date | Estimated date the infrastructure is to be completed, stored as text in month-day-year format (01-31-22 is 31 January 2022). |
Data source: Interphone