Planned Stormwater Levees, Moreton Bay Region

Line features showing 15 planned future levees in the stormwater trunk infrastructure network of the Moreton Bay Region. Each feature carries its service catchment, map reference, description, estimated delivery period and establishment cost. Callers can retrieve them per suburb as GeoJSON or for the area near an address.

Endpoints

Planned Stormwater Levees, Moreton Bay Region (map)

GET/v1/suburbs/{suburb_name}/layers/planned-stormwater-levees-moreton-bay10¢ per call
Query parameterDescription
fieldsComma-separated field slugs (below). Omit for all.
limitFeatures per page, 1 to 500 (default 200).
offsetItems to skip, for the next page (`next_offset`).
curl -X GET 'https://api.microburbs.com.au/v1/suburbs/Caboolture/layers/planned-stormwater-levees-moreton-bay' \
  -H 'Authorization: Bearer test'

test is the public sandbox key: it works only for the sandbox's allowlisted suburbs and addresses. Use your own key for anything else.

Planned Stormwater Levees, Moreton Bay Region nearby

GET/v1/properties/{gnaf_id}/layers/planned-stormwater-levees-moreton-bay/nearby10¢ per call
Query parameterDescription
radius_mSearch radius in metres, 1 to 2000 (default 500).
fieldsComma-separated field slugs (below). Omit for all.
limitFeatures per page, 1 to 500 (default 200).
offsetItems to skip, for the next page (`next_offset`).
curl -X GET 'https://api.microburbs.com.au/v1/properties/GAQLD156514260/layers/planned-stormwater-levees-moreton-bay/nearby' \
  -H 'Authorization: Bearer test'

test is the public sandbox key: it works only for the sandbox's allowlisted suburbs and addresses. Use your own key for anything else.

About this dataset

Moreton Bay Region in south-east Queensland, with a bounding box of about 152.82 to 153.0036 longitude and -27.3229 to -27.0752 latitude. The layer has 15 features. Suburbs include Brendale, Burpengary, Burpengary East, Caboolture, Dayboro, Deception Bay, Kallangur and Morayfield. The record dates from 8 March 2022 and was last modified on 25 June 2026. Current to 2026-06-25; refreshed As published; no regular update schedule is stated.. These figures are modelled estimates.

What it is

A map layer of proposed levees that form part of the local government infrastructure plan for stormwater in the Moreton Bay Region, north of Brisbane. Each levee is a line feature with planning and cost attributes. All 15 features in the layer have the status Future.

What it shows

It shows where trunk stormwater levees are planned, which service catchment each belongs to (for example Lower Pine River, Hays Inlet, Burpengary Creek and Caboolture River), and the estimated delivery window (2026-2031 or 2031-2036). It also gives the estimated asset and establishment cost, from about AUD 67,176 to AUD 709,135. Land cost is zero for every feature.

Why use it

Levees signal future flood and stormwater mitigation works that can affect land use, development potential, infrastructure charges and flood risk over time. Analysts, developers and property researchers can use the layer to check whether planned works are near a site. It also helps when assessing the timing and scale of public investment in an area.

How it is built

We hold the planned levee alignments as lines with the attributes taken as supplied. Suburb requests return geometry simplified to about 5 metres, and nearby-address requests return full detail. Every feature falls within a suburb, and none lie outside suburb boundaries. The layer holds only planned items and has no existing or built levees.

Shortcomings

  • Only 15 features, so this is a small set of planned levees and not a full flood-protection inventory.
  • All items are future and proposed. Alignments, timing and costs may change and do not show that works are approved or funded.
  • Costs are planning estimates and not tendered or actual costs. Land cost is zero for every feature, so land acquisition costs are not captured.
  • Suburb calls simplify lines to about 5 metres, so use a nearby call when you need precise geometry.

Fields

FieldUnitDescription
service_catchment
Service catchment
Name of the stormwater service catchment the levee serves, such as Lower Pine River, Hays Inlet, Burpengary Creek or Caboolture River.
map_reference
Map reference
Plan map sheet reference for the levee, such as UPR_005a or CAB_070.
code
Infrastructure code
Short code for the infrastructure network; SW means stormwater.
lgip
LGIP network
Local government infrastructure plan network the item belongs to; Stormwater for all features.
status
Status
Delivery status of the item; every feature is Future, meaning planned and not yet built.
trunk_infrastructure
Trunk infrastructure type
Type of trunk infrastructure; Levees for all features.
description
Description
Name or location of the levee, for example Belford Drive - Levee or Showgrounds Levee.
estimated_timing
Estimated timing
Planned delivery period as a range of years, either 2026-2031 or 2031-2036.
cost_land
Land cost
AUDEstimated land acquisition cost; zero for every feature.
cost_asset
Asset cost
AUDEstimated cost of constructing the levee asset, ranging from about 67,176 to 709,135.
establishment_cost
Establishment cost
AUDTotal estimated cost to establish the levee, which matches the asset cost in the sample because land cost is zero.
suburb
Suburb
Suburb in which the levee lies, such as Burpengary East, Kallangur or Caboolture.