MicroburbsMicroburbs
Free sandbox: try any request below on the sample suburbs, no signup. For every suburb, create an API key.
Classic docs
Microburbs Property Data API
Dataset · Planning

Planned Bioretention Basins – Moreton Bay Stormwater Network

Polygon layer of four future bioretention basins in the Moreton Bay stormwater trunk infrastructure network, in Albany Creek, Caboolture and Deception Bay. Each feature carries the service catchment, map reference, estimated asset cost, estimated timing and nearest park or street address. It is returned per suburb as GeoJSON or for features near an address.

Endpoints

Planned Bioretention Basins – Moreton Bay Stormwater Network (map)

GET/v1/suburbs/{suburb_name}/layers/planned-bioretention-basins-moreton-bay10¢ per call

Served by /v1/suburbs/{suburb_name}/layers/{slug}, which documents every parameter, the response shape and errors, and has a live playground.

Query parameterDescription
fieldsComma-separated field slugs (below). Omit for all.
limitFeatures per page, 1 to 500 (default 200).
offsetItems to skip, for the next page (`next_offset`).
curl -X GET 'https://api.microburbs.com.au/v1/suburbs/Caboolture/layers/planned-bioretention-basins-moreton-bay' \
  -H 'Authorization: Bearer test'

test is the public sandbox key: it works only for the sandbox's allowlisted suburbs and addresses. Use your own key for anything else.

Planned Bioretention Basins – Moreton Bay Stormwater Network nearby

GET/v1/properties/{gnaf_id}/layers/planned-bioretention-basins-moreton-bay/nearby10¢ per call

Served by /v1/properties/{gnaf_id}/layers/{slug}/nearby, which documents every parameter, the response shape and errors, and has a live playground.

Query parameterDescription
radius_mSearch radius in metres, 1 to 2000 (default 500).
fieldsComma-separated field slugs (below). Omit for all.
limitFeatures per page, 1 to 500 (default 200).
offsetItems to skip, for the next page (`next_offset`).
curl -X GET 'https://api.microburbs.com.au/v1/properties/GAQLD155114018/layers/planned-bioretention-basins-moreton-bay/nearby' \
  -H 'Authorization: Bearer test'

test is the public sandbox key: it works only for the sandbox's allowlisted suburbs and addresses. Use your own key for anything else.

About this dataset

Parts of the Moreton Bay region in south-east Queensland, within the bounds of longitude 152.94 to 153.01 and latitude -27.36 to -27.08. It has 4 features across Albany Creek, Caboolture and Deception Bay. Service catchments include Lower Pine River, Burpengary Creek and Caboolture River. The record timestamp is 8 March 2022, and the layer was last modified in June 2026. Current to 2026-06-25; refreshed As published; no regular update schedule is stated.. These figures are modelled estimates.

What it is

A map layer of planned bioretention basins, which are stormwater treatment devices that filter runoff. They are part of the stormwater network in the local government infrastructure plan (LGIP) for the Moreton Bay region. The layer holds 4 polygon features, all with status Future.

What it shows

It shows where trunk stormwater basins are proposed, which stormwater service catchment each belongs to, and the estimated cost and delivery window. Asset costs range from about AUD 245,099 to AUD 1,407,496. Land cost is 0 for all features, and the timing is 2021-2026.

Why use it

Developers, planners and analysts can use it to see where future stormwater infrastructure is planned near a site. It also helps to estimate infrastructure charges and the likely timing of local drainage works. It can be used for due diligence on land in or near these catchments.

How it is built

We load the planned infrastructure polygons and keep their attributes unchanged. Each feature is assigned to a suburb. Suburb requests return simplified geometry (about 5 metres), and nearby-address requests return full detail. All 4 features fall inside a suburb. The layer covers only basins in the plan, not existing basins or other stormwater assets.

Shortcomings

  • Only 4 features are included, so the layer is not a full picture of stormwater infrastructure in the region.
  • All features have status Future, and the costs and timing (2021-2026) are planning estimates. Actual delivery may be later, different or not happen.
  • Asset cost and establishment cost have identical values, and land cost is 0 for every feature, so land acquisition costs are not captured.
  • Suburb requests simplify geometry to about 5 metres, so use nearby-address requests when you need precise boundaries.

Fields

FieldUnitDescription
service_catchment
Service catchment
Name of the stormwater service catchment the basin serves, such as Lower Pine River, Burpengary Creek or Caboolture River.
map_reference
Map reference
Plan map identifier for the basin, such as LPR_WR15 or CAB_BB54.
code
Infrastructure network code
Short code for the infrastructure network; SW means stormwater.
lgip
LGIP network
Local government infrastructure plan network the item belongs to; here Stormwater.
status
Status
Delivery status of the item; all features are Future.
trunk_infrastructure
Trunk infrastructure type
Type of trunk infrastructure item; here Bioretention Basin.
cost_land
Land cost
AUDEstimated land acquisition cost; 0 for all features.
cost_asset
Asset cost
AUDEstimated cost to build the asset, ranging from about 245,099 to 1,407,496.
establishment_cost
Establishment cost
AUDEstimated total establishment cost; equal to the asset cost in every feature.
estimated_timing
Estimated timing
Planned delivery period, given as a range of years such as 2021-2026.
closest_address
Closest address
Nearest park or street to the basin, such as Bleakley Park, Albany Creek.
suburb
Suburb
Suburb the feature falls in, in upper case, such as ALBANY CREEK, CABOOLTURE or DECEPTION BAY.