Moreton Bay Planned Stormwater Network Upgrades (LGIP)
Line features showing 466 planned trunk stormwater upgrades in the Moreton Bay region, taken from the local government infrastructure plan. Each feature carries a service catchment, map reference, project description, estimated cost and expected delivery period. Callers get the features per suburb as GeoJSON or near an address.
Endpoints
Moreton Bay Planned Stormwater Network Upgrades (LGIP) (map)
/v1/suburbs/{suburb_name}/layers/moreton-bay-planned-stormwater-network-upgrades10¢ per callServed by /v1/suburbs/{suburb_name}/layers/{slug}, which documents every parameter, the response shape and errors, and has a live playground.
| Query parameter | Description |
|---|---|
fields | Comma-separated field slugs (below). Omit for all. |
limit | Features per page, 1 to 500 (default 200). |
offset | Items to skip, for the next page (`next_offset`). |
curl -X GET 'https://api.microburbs.com.au/v1/suburbs/Brendale/layers/moreton-bay-planned-stormwater-network-upgrades' \
-H 'Authorization: Bearer test'test is the public sandbox key: it works only for the sandbox's allowlisted suburbs and addresses. Use your own key for anything else.
Moreton Bay Planned Stormwater Network Upgrades (LGIP) nearby
/v1/properties/{gnaf_id}/layers/moreton-bay-planned-stormwater-network-upgrades/nearby10¢ per callServed by /v1/properties/{gnaf_id}/layers/{slug}/nearby, which documents every parameter, the response shape and errors, and has a live playground.
| Query parameter | Description |
|---|---|
radius_m | Search radius in metres, 1 to 2000 (default 500). |
fields | Comma-separated field slugs (below). Omit for all. |
limit | Features per page, 1 to 500 (default 200). |
offset | Items to skip, for the next page (`next_offset`). |
curl -X GET 'https://api.microburbs.com.au/v1/properties/GAQLD425544149/layers/moreton-bay-planned-stormwater-network-upgrades/nearby' \
-H 'Authorization: Bearer test'test is the public sandbox key: it works only for the sandbox's allowlisted suburbs and addresses. Use your own key for anything else.
About this dataset
Moreton Bay region in south-east Queensland, including suburbs such as Caboolture, Brendale, Bray Park, Clontarf and Woody Point. It has 466 line features within longitude 152.95 to 153.11 and latitude -27.32 to -27.06. Service catchments include Caboolture River, Lower Pine River and Redcliffe. The earliest record date is 8 March 2022. Current to 2026-06-25; refreshed As published. The layer was last modified in June 2026, and no regular update schedule is stated.. These figures are modelled estimates.
What it is
A map layer of future trunk stormwater projects in the Moreton Bay region, such as trunk drainage, detention and stormwater upgrades. Each line is one planned works item with its cost and the five-year period in which it is expected to be delivered.
What it shows
It shows where council plans to build or upgrade trunk drainage, which service catchment each project belongs to, and the estimated establishment cost. All records have the status Future, and the timing is given as five-year bands such as 2021-2026, 2026-2031 and 2031-2036.
Why use it
Planned trunk drainage points to where growth is expected and where infrastructure charges apply. Developers, valuers and buyers can use it to check whether a site is near planned stormwater works and when they might happen. Analysts can use the costs to compare investment across suburbs and catchments.
How it is built
We load the infrastructure plan's stormwater network layer as line geometry and assign each feature to a suburb. Suburb requests return simplified geometry (about 5 metres), and nearby-address requests return full detail. No features fall outside a suburb. The layer covers only projects listed in the plan, so it excludes existing drains and non-trunk works.
Shortcomings
- Costs are planning estimates, not tendered or committed budgets, and may change as the plan is revised.
- Timing is a five-year band, not a delivery date, and projects may be delayed or dropped.
- Land cost is 0 for every record, so only asset cost is represented. Asset cost and establishment cost have the same values in the examples shown.
- Suburb requests return lines simplified to about 5 metres, so they should not be used for precise alignment. Only trunk projects are included, not the whole drainage network.
Fields
| Field | Unit | Description |
|---|---|---|
service_catchmentService catchment | Name of the stormwater service catchment the project belongs to, such as Caboolture River, Lower Pine River or Redcliffe. | |
map_referenceMap reference | Plan map code for the project, with a catchment prefix and number, such as LPR_068 or CAB_064. | |
codeInfrastructure code | Short code for the infrastructure type; the value is SW for stormwater. | |
lgipLGIP network | Infrastructure plan network the item belongs to; the value is Stormwater. | |
trunk_infrastructureTrunk infrastructure type | Type of trunk infrastructure item; the value is Stormwater Network Upgrade. | |
cost_landLand cost | AUD | Estimated cost of acquiring land for the project; it is 0 for every record. |
cost_assetAsset cost | AUD | Estimated cost of building the asset, ranging from about 35,318 to about 6,035,919. |
establishment_costEstablishment cost | AUD | Total estimated cost to establish the project, ranging from about 35,318 to about 6,035,919. |
estimated_timingEstimated timing | Five-year period in which the project is expected to be delivered, such as 2021-2026, 2026-2031 or 2031-2036. | |
suburbSuburb | Suburb in which the project feature is located, such as Caboolture, Clontarf or Brendale. | |
statusStatus | Delivery status of the project; the value is Future. | |
descriptionProject description | Short text naming the project, such as BS7 - Trunk Drainage or Brendale Commercial Area - Stormwater Upgrades. |