Lake Macquarie Cycleway Bicycle Counts (Morning Peak)
Point locations of five bicycle counting sites in Lake Macquarie and Newcastle, NSW, with the roads meeting at each site and the number of cyclists counted on Tuesday mornings between March 2011 and August 2016. A caller gets site coordinates, intersection legs and counts per survey round, served per suburb or near an address.
Endpoints
Lake Macquarie Cycleway Bicycle Counts (Morning Peak) (map)
/v1/suburbs/{suburb_name}/layers/lake-macquarie-bicycle-counts10¢ per callServed by /v1/suburbs/{suburb_name}/layers/{slug}, which documents every parameter, the response shape and errors, and has a live playground.
| Query parameter | Description |
|---|---|
fields | Comma-separated field slugs (below). Omit for all. |
limit | Features per page, 1 to 500 (default 200). |
offset | Items to skip, for the next page (`next_offset`). |
curl -X GET 'https://api.microburbs.com.au/v1/suburbs/Belmont%20North/layers/lake-macquarie-bicycle-counts' \
-H 'Authorization: Bearer test'test is the public sandbox key: it works only for the sandbox's allowlisted suburbs and addresses. Use your own key for anything else.
Lake Macquarie Cycleway Bicycle Counts (Morning Peak) nearby
/v1/properties/{gnaf_id}/layers/lake-macquarie-bicycle-counts/nearby10¢ per callServed by /v1/properties/{gnaf_id}/layers/{slug}/nearby, which documents every parameter, the response shape and errors, and has a live playground.
| Query parameter | Description |
|---|---|
radius_m | Search radius in metres, 1 to 2000 (default 500). |
fields | Comma-separated field slugs (below). Omit for all. |
limit | Features per page, 1 to 500 (default 200). |
offset | Items to skip, for the next page (`next_offset`). |
curl -X GET 'https://api.microburbs.com.au/v1/properties/GANSW704197290/layers/lake-macquarie-bicycle-counts/nearby' \
-H 'Authorization: Bearer test'test is the public sandbox key: it works only for the sandbox's allowlisted suburbs and addresses. Use your own key for anything else.
About this dataset
Five sites between about -33.020 and -32.907 latitude and 151.607 and 151.715 longitude, in the Lake Macquarie and Newcastle electorates, NSW. Suburbs include Adamstown, Belmont North, Booragul, Glendale and Wallsend. Counts run from March 2011 to August 2016, and no feature falls outside a suburb. Current to 2023-08-09; refreshed One-off; no new counts since August 2016.
What it is
A small layer of five points, each a junction on or near a shared path or cycleway such as the Fernleigh Track and Tramway Track. Each point lists up to four legs (the approach roads or paths with compass direction) and cyclist counts from several survey rounds.
What it shows
It shows how many bicycles passed each site during a morning count on a Tuesday, in up to seven survey rounds from March 2011 to August 2016. It lets you compare sites and see change over time where a site was counted more than once.
Why use it
Cycling counts help assess demand for bike infrastructure, compare active-transport use across locations, and add context to area or property analysis near cycleways. They are one of few direct measures of cycling volume in the area.
How it is built
Counts were made by volunteers observing in person. Most rounds were two-hour counts from 7am to 9am. The October 2013 count at the Tramway Track / TAFE entrance / Frederick Street site was one hour only. The August 2016 round was a one-hour count from 7.30am to 8.30am on a cold, dry morning after a week of rain. We load the sites as points and attach them to suburbs. Not every site was counted in every round.
Shortcomings
- Only five sites, so it is not a representative sample of cycling across the region.
- Survey rounds differ in duration (two hours, one hour) and weather, so raw counts are not strictly comparable between rounds.
- Many cells are blank: tues_oct_2014 is empty for 60% of sites, and tues_aug_2016, tues_oct_2013 and tues_mar_2012 for 40%. Time series are incomplete.
- Counts cover weekday morning peak only, so they miss weekend and recreational use, and they are single-day observations.
Fields
| Field | Unit | Description |
|---|---|---|
stateState | Australian state of the site, NSW for all rows. | |
electorateElectorate | State electorate the site falls in, Lake Macquarie or Newcastle. | |
latitudeLatitude | degrees | Latitude of the count site in decimal degrees. |
longitudeLongitude | degrees | Longitude of the count site in decimal degrees. |
no_legsNumber of legs | count | Number of approaches (roads or paths) meeting at the site, either 3 or 4. |
leg1Leg 1 | Name and compass direction of the first approach, such as Tramway Track [NE]. | |
leg2Leg 2 | Name and compass direction of the second approach. | |
leg3Leg 3 | Name and compass direction of the third approach. | |
leg4Leg 4 | Name and compass direction of the fourth approach; blank for 40% of sites, which have only three legs. | |
tues_aug_2016Cyclists counted, Tuesday August 2016 | count | Cyclists counted in a one-hour morning count (7.30am to 8.30am) in August 2016; blank for 40% of sites. |
tues_oct_2014Cyclists counted, Tuesday October 2014 | count | Cyclists counted in a two-hour morning count (7am to 9am) in October 2014; blank for 60% of sites. |
tues_oct_2013Cyclists counted, Tuesday October 2013 | count | Cyclists counted in a morning count in October 2013, usually two hours, one hour at one site; blank for 40% of sites. |
tues_mar_2012Cyclists counted, Tuesday March 2012 | count | Cyclists counted in a two-hour morning count in March 2012; blank for 40% of sites. |
tues_oct_2012Cyclists counted, Tuesday October 2012 | count | Cyclists counted in a two-hour morning count in October 2012; blank for 80% of sites. |
tues_oct_2011Cyclists counted, Tuesday October 2011 | count | Cyclists counted in a two-hour morning count in October 2011; blank for 40% of sites. |
tue_mar_2011Cyclists counted, Tuesday March 2011 | count | Cyclists counted in a two-hour morning count in March 2011; blank for 80% of sites. |
Data source: Lake Macquarie City Council
