Interphone Anticipatory Notice, Erskine WA (FTTP)
A single mapped polygon for the RAAFA WA Erskine Village project area in Erskine, WA 6210. It records an anticipatory notice from Interphone Pty Ltd, a statutory infrastructure provider (SIP), for fibre to the premises (FTTP) broadband. A caller gets the provider name, notice type, area identifier, contract summary, project area, infrastructure type and estimated completion date.
Endpoints
Interphone Anticipatory Notice, Erskine WA (FTTP) (map)
/v1/suburbs/{suburb_name}/layers/interphone-anticipatory-notice-erskine-wa-fttp10¢ per callServed by /v1/suburbs/{suburb_name}/layers/{slug}, which documents every parameter, the response shape and errors, and has a live playground.
| Query parameter | Description |
|---|---|
fields | Comma-separated field slugs (below). Omit for all. |
limit | Features per page, 1 to 500 (default 200). |
offset | Items to skip, for the next page (`next_offset`). |
curl -X GET 'https://api.microburbs.com.au/v1/suburbs/Erskine%20%28WA%29/layers/interphone-anticipatory-notice-erskine-wa-fttp' \
-H 'Authorization: Bearer test'test is the public sandbox key: it works only for the sandbox's allowlisted suburbs and addresses. Use your own key for anything else.
Interphone Anticipatory Notice, Erskine WA (FTTP) nearby
/v1/properties/{gnaf_id}/layers/interphone-anticipatory-notice-erskine-wa-fttp/nearby10¢ per callServed by /v1/properties/{gnaf_id}/layers/{slug}/nearby, which documents every parameter, the response shape and errors, and has a live playground.
| Query parameter | Description |
|---|---|
radius_m | Search radius in metres, 1 to 2000 (default 500). |
fields | Comma-separated field slugs (below). Omit for all. |
limit | Features per page, 1 to 500 (default 200). |
offset | Items to skip, for the next page (`next_offset`). |
curl -X GET 'https://api.microburbs.com.au/v1/properties/GAWA_160657457/layers/interphone-anticipatory-notice-erskine-wa-fttp/nearby' \
-H 'Authorization: Bearer test'test is the public sandbox key: it works only for the sandbox's allowlisted suburbs and addresses. Use your own key for anything else.
About this dataset
One polygon in Erskine, WA, within the bounds 115.6938 to 115.6992 east and -32.5589 to -32.5553 south. No features fall outside the suburb. The notice dates from February 2021, and the record's time range starts on 19 February 2021 with no end date. Current to 2023-08-09; refreshed One-off record, last modified August 2023. Not updated on a regular schedule..
What it is
A map layer holding one statutory infrastructure provider anticipatory notice. The notice covers a contract to install telecommunications network infrastructure at the RAAFA WA Erskine Village site in Erskine. The notice was given on 16 February 2021, and the contract is dated 15 February 2021.
What it shows
It shows the footprint where Interphone Pty Ltd planned to install FTTP, the type of infrastructure and the estimated completion date. The contract text describes a real estate development arrangement. The layer is a record of planned build, not of services actually connected.
Why use it
Analysts can use it to check whether a site in Erskine was set to get fibre-to-the-premises broadband, and who the responsible provider was. It is useful for property due diligence, broadband availability checks and retirement-village or estate research in the Mandurah area.
How it is built
We load the notice and its project area boundary as a polygon with the notice attributes attached. The API serves it as map features per suburb in GeoJSON, and for features near an address. Suburb requests simplify the polygon to about 5 metres, while nearby requests return full detail. The layer has one feature, so coverage is limited to this one site.
Shortcomings
- Only one notice and one site are covered. The layer says nothing about other providers or other areas of Erskine.
- The estimated completion date is stored as text and the example value (31/06/2021) is not a valid calendar date. The source description gives 31 March 2021, so treat the date with care.
- The layer shows an anticipatory notice, which is a plan. It does not confirm that the fibre was built, when it was finished or whether services are available. The title notes the notice is now declared, but no later status is recorded here.
- The contract field is a truncated text summary, not the full contract terms.
Fields
| Field | Unit | Description |
|---|---|---|
name_of_sipName of SIP | Name of the statutory infrastructure provider that gave the notice, here Interphone Pty Ltd. | |
service_areaService area type | Type of service area record, here Anticipatory Notice. | |
service_area_identifierService area identifier | Short label identifying the service area, here RAAFA Erskine. | |
contractContract summary | Text describing the contract under which the provider will install the network, including that it is a real estate development arrangement. | |
project_areaProject area | Text name and location of the project area, here RAAFA WA Erskine Village, WA, 6210. | |
network_infrastructureNetwork infrastructure | Type of network infrastructure to be installed, here FTTP (fibre to the premises). | |
estimated_completion_dateEstimated completion date | Provider's estimated completion date for the build, stored as text in day/month/year form. |
Data source: Interphone