MicroburbsMicroburbs
Free sandbox: try any request below on the sample suburbs, no signup. For every suburb, create an API key.
Classic docs
Microburbs Property Data API
Dataset · Planning

Future Trunk Road Intersection Upgrades - Moreton Bay

Point locations of 24 planned trunk road intersection upgrades in the Moreton Bay region, taken from the local government infrastructure plan's transport network. Each point carries a map reference, infrastructure type, estimated establishment cost, estimated delivery period, nearest address, suburb and service catchment. Callers can retrieve features per suburb as GeoJSON or search near an address.

Endpoints

Future Trunk Road Intersection Upgrades - Moreton Bay (map)

GET/v1/suburbs/{suburb_name}/layers/future-trunk-road-intersection-upgrades-moreton-bay10¢ per call

Served by /v1/suburbs/{suburb_name}/layers/{slug}, which documents every parameter, the response shape and errors, and has a live playground.

Query parameterDescription
fieldsComma-separated field slugs (below). Omit for all.
limitFeatures per page, 1 to 500 (default 200).
offsetItems to skip, for the next page (`next_offset`).
curl -X GET 'https://api.microburbs.com.au/v1/suburbs/Ferny%20Hills/layers/future-trunk-road-intersection-upgrades-moreton-bay' \
  -H 'Authorization: Bearer test'

test is the public sandbox key: it works only for the sandbox's allowlisted suburbs and addresses. Use your own key for anything else.

Future Trunk Road Intersection Upgrades - Moreton Bay nearby

GET/v1/properties/{gnaf_id}/layers/future-trunk-road-intersection-upgrades-moreton-bay/nearby10¢ per call

Served by /v1/properties/{gnaf_id}/layers/{slug}/nearby, which documents every parameter, the response shape and errors, and has a live playground.

Query parameterDescription
radius_mSearch radius in metres, 1 to 2000 (default 500).
fieldsComma-separated field slugs (below). Omit for all.
limitFeatures per page, 1 to 500 (default 200).
offsetItems to skip, for the next page (`next_offset`).
curl -X GET 'https://api.microburbs.com.au/v1/properties/GAQLD158221339/layers/future-trunk-road-intersection-upgrades-moreton-bay/nearby' \
  -H 'Authorization: Bearer test'

test is the public sandbox key: it works only for the sandbox's allowlisted suburbs and addresses. Use your own key for anything else.

About this dataset

The Moreton Bay region in south-east Queensland, with points between about longitude 152.94 and 153.10 and latitude -27.40 and -27.08. There are 24 features, including in Bunya, Burpengary, Caboolture, Dakabin, Everton Hills, Ferny Hills, Griffin, Kippa-Ring, Lawnton and Mango Hill. Estimated timing covers the periods 2021-2026, 2026-2031 and 2031-2036. The layer record dates from March 2022. Current to 2026-06-25; refreshed As published. The planning scheme layer changes only when the infrastructure plan is amended, and no regular update schedule is stated.. These figures are modelled estimates.

What it is

A point layer of future trunk transport infrastructure, mainly road intersection upgrades, some including a road bridge. It forms the transport network part of the local government infrastructure plan that sits within the planning scheme for the Moreton Bay region. All 24 features have a status of Future.

What it shows

It shows where intersection upgrades are planned, what type of trunk infrastructure each involves, the estimated establishment cost, and the five-year window in which delivery is expected. It also shows which service catchment (Urban North, Urban East or Urban South) each upgrade belongs to.

Why use it

Planned intersection upgrades can change future traffic flow, road capacity and construction disruption near a property or site. Developers, valuers and analysts can use the layer to screen sites for planned infrastructure and to see how much investment is planned in a suburb. The costs and timing also give an indication of the infrastructure charges base that supports growth.

How it is built

We load the planning scheme's trunk transport network layer and keep the intersection upgrade points as map features with their attributes. Each feature is assigned to a suburb, and all 24 fall inside a suburb. The data is served as GeoJSON per suburb and as a search of features near an address. Only the Moreton Bay region is covered, and only intersection upgrade points are included, not other trunk network items.

Shortcomings

  • Costs are planning-level estimates of establishment cost, not tender prices or committed budgets, and they range from about $320,585 to about $18.06 million.
  • Timing is a five-year window, not a construction date. Some windows, such as 2021-2026, may already have passed, and we cannot confirm whether a project has been built or delayed.
  • Every row has a status of Future, so the layer does not show progress or completion.
  • Only 24 points are included, and only for the Moreton Bay region. Other trunk transport items and areas outside the region are not covered.

Fields

FieldUnitDescription
status
Status
Delivery status of the infrastructure item; all rows are Future.
map_reference
Map reference
Plan map reference code for the item, such as TR - 21 or TR - 43.
code
Code
Short code for the infrastructure network type, TN for transport network.
lgip
LGIP network
Name of the local government infrastructure plan network the item belongs to, here Transport Network.
trunk_infrastructure
Trunk infrastructure type
Type of trunk infrastructure planned, for example Road Intersection or Road Intersection, Road Bridge.
establishment_cost
Establishment cost
AUDEstimated cost to establish the item, ranging from about 320,585 to about 18,055,554 dollars.
estimated_timing
Estimated timing
Five-year period in which delivery is expected, such as 2026-2031.
closest_address
Closest address
Nearest road intersection or street address description for the upgrade, sometimes truncated.
suburb
Suburb
Suburb in which the upgrade point is located, in upper case.
service_catchment
Service catchment
Infrastructure service catchment the item serves, such as Urban North, Urban East or Urban South.