Future Active Transport Network – Moreton Bay
Planned walking and cycling infrastructure lines across the Moreton Bay region, taken from the local government infrastructure plan for active transport. Each of the 122 line features carries a map reference, the type of facility, a short description, an establishment cost, an estimated delivery period and the nearest address. Callers get them per suburb as GeoJSON or near an address.
Endpoints
Future Active Transport Network – Moreton Bay (map)
/v1/suburbs/{suburb_name}/layers/future-active-transport-network-moreton-bay10¢ per callServed by /v1/suburbs/{suburb_name}/layers/{slug}, which documents every parameter, the response shape and errors, and has a live playground.
| Query parameter | Description |
|---|---|
fields | Comma-separated field slugs (below). Omit for all. |
limit | Features per page, 1 to 500 (default 200). |
offset | Items to skip, for the next page (`next_offset`). |
curl -X GET 'https://api.microburbs.com.au/v1/suburbs/Morayfield/layers/future-active-transport-network-moreton-bay' \
-H 'Authorization: Bearer test'test is the public sandbox key: it works only for the sandbox's allowlisted suburbs and addresses. Use your own key for anything else.
Future Active Transport Network – Moreton Bay nearby
/v1/properties/{gnaf_id}/layers/future-active-transport-network-moreton-bay/nearby10¢ per callServed by /v1/properties/{gnaf_id}/layers/{slug}/nearby, which documents every parameter, the response shape and errors, and has a live playground.
| Query parameter | Description |
|---|---|
radius_m | Search radius in metres, 1 to 2000 (default 500). |
fields | Comma-separated field slugs (below). Omit for all. |
limit | Features per page, 1 to 500 (default 200). |
offset | Items to skip, for the next page (`next_offset`). |
curl -X GET 'https://api.microburbs.com.au/v1/properties/GAQLD154925224/layers/future-active-transport-network-moreton-bay/nearby' \
-H 'Authorization: Bearer test'test is the public sandbox key: it works only for the sandbox's allowlisted suburbs and addresses. Use your own key for anything else.
About this dataset
Moreton Bay region in south-east Queensland, including suburbs such as Albany Creek, Arana Hills, Bellmere, Bongaree, Bray Park, Brendale, Burpengary, Burpengary East, Caboolture and Caboolture South. It has 122 line features, spanning roughly longitude 152.77 to 153.20 and latitude -27.40 to -26.95. Estimated timings are 2021-2026, 2026-2031 and 2031-2036. The layer was created in March 2022 and last modified in June 2026. Current to 2026-06-25; refreshed As published. The update frequency is not stated, so expect changes only when the plan is amended.. These figures are modelled estimates.
What it is
A line layer of future active transport projects: footpaths, shared paths, on-road cycle lanes and veloways that are planned but not yet built. Each line is one trunk infrastructure item in the active transport part of the local infrastructure plan.
What it shows
It shows where new or upgraded walking and cycling links are planned, what type of facility is proposed, the estimated cost to establish it and the five-year window in which it is expected. Examples include upgrading a footpath to a shared path in a road verge, new 1.2 m footpaths, and new on-road cycle lanes.
Why use it
Planned active transport links can affect amenity, accessibility and the appeal of nearby properties over time. Analysts can use the layer to compare suburbs by planned investment, check what is proposed near a site, or add future infrastructure to location reports.
How it is built
We load the plan's future active transport network as line geometry with its attributes and serve it by suburb and by proximity to an address. Suburb requests return simplified lines (about 5 metres), while nearby requests return full detail. All 122 features fall within suburbs, though a small share has no suburb value recorded.
Shortcomings
- These are planned projects, not built infrastructure. Timing and routes can change, and funding is not guaranteed.
- Establishment costs are planning estimates. Some items show 0, so a zero should not be read as a free project.
- Timing is a five-year band, not a delivery date. Some bands, such as 2021-2026, may already be partly past.
- About 2% of features have no suburb value, and suburb requests return lines simplified to about 5 metres. Use nearby requests when you need exact alignment.
Fields
| Field | Unit | Description |
|---|---|---|
lgipInfrastructure plan | Name of the infrastructure plan network the item belongs to, such as Active Transport. | |
codePlan code | Short code for the network, such as AT for active transport. | |
statusStatus | Delivery status of the item, such as Future. | |
map_referenceMap reference | Identifier of the item on the plan map, such as AT - 63. | |
trunk_infrastructureTrunk infrastructure type | Type of facility proposed, for example on-road cycle lanes, a footpath on one side of the road or a shared path in the road verge. Values may be truncated. | |
descriptionProject description | Short text describing the works, the street and the extent of the project. Values may be truncated. | |
establishment_costEstablishment cost | AUD | Estimated cost to establish the item, ranging from 0 to about 4.35 million. |
estimated_timingEstimated timing | Five-year period in which delivery is expected, such as 2026-2031. | |
closest_addressClosest address | Nearest street and suburb to the item, as a text label. | |
suburbSuburb | Suburb the item lies in, in upper case. It is empty for about 2% of features. | |
shape_length_1Line length | m | Length of the line feature, from about 127 m to about 3,715 m. |
