MicroburbsMicroburbs
Free sandbox: try any request below on the sample suburbs, no signup. For every suburb, create an API key.
Classic docs
Microburbs Property Data API
Dataset · Economy

Construction Work Done, Chain Volume Measures, Australia

National quarterly series of the value of construction work done in Australia, measured in chain volume terms (inflation-adjusted) in $'000. A caller gets values split by sector (private, public, total) and by type of work (residential building, non-residential building, total building, engineering construction, non-residential construction, total construction), as at the June 2020 final estimates.

Endpoint

Construction Work Done, Chain Volume Measures, Australia

GET/v1/australia/datasets/construction-work-done-chain-volume-australia5¢ per call

Served by /v1/australia/datasets/{slug}, which documents every parameter, the response shape and errors, and has a live playground.

Query parameterDescription
fieldsComma-separated field slugs (below). Omit for all.
fromFirst period to include: 2020, 2020-Q3, 2020-07 or 2020-07-01.
toLast period to include, same formats as `from`.
curl -X GET 'https://api.microburbs.com.au/v1/australia/datasets/construction-work-done-chain-volume-australia' \
  -H 'Authorization: Bearer test'

test is the public sandbox key: it works only for the sandbox's allowlisted suburbs and addresses. Use your own key for anything else.

About this dataset

Australia as a single national area. Quarterly periods start at September 1976 (the first quarter in the data) and, based on 176 quarterly observations in the fullest series, run to June 2020. Residential building and most building series have 176 quarters. Private sector total building has 160. Engineering, non-residential construction, and total construction series for the total and public sectors have 136 quarters. Current to 2020-06-01; refreshed One-off release of the June 2020 final estimates. We do not update it on a fixed schedule..

What it is

A national time series of construction work done, expressed in chain volume measures so that price changes are removed and quarters can be compared in real terms. Each quarterly value is in thousands of dollars. Figures are broken down by private, public and total sectors, and by building and engineering type.

What it shows

It shows how much real construction activity occurred each quarter across the whole country, and how that activity divides between housing, other buildings and engineering works such as roads, rail and utilities. It also shows the split between private and public sector work.

Why use it

Analysts use it to read the construction cycle, compare long-run residential and non-residential building activity, and gauge how much public investment contributes. It gives national context for local development application and building approval data.

How it is built

We hold the final June 2020 estimates as a table with one row per quarter and one column per sector and construction type. The data is for Australia as a whole, so there is only one area and no suburb, LGA, postcode, SA2 or state breakdown. Some series have fewer quarters than others, so early periods are blank for those columns.

Shortcomings

  • National totals only. The data cannot be used for any suburb, LGA, postcode, SA2 or state analysis.
  • Values are chain volume measures, which remove price changes. They are not current-price dollars. Components of a chain volume series may not add exactly to the totals.
  • Series have different lengths: the engineering, non-residential construction and total construction series for the total and public sectors have 136 quarters, against 176 for others, so the earliest quarters are missing in some columns.
  • The data ends at June 2020 and so does not reflect later activity. We have not confirmed whether the values are seasonally adjusted.

Fields

FieldUnitDescription
value_of_work_done_chain_volume_measures_private_s
Private sector residential building work done
$'000Real value of residential building work done by the private sector in the quarter, in thousands of dollars.
value_of_work_done_chain_volume_measures_private_s_2
Private sector non-residential building work done
$'000Real value of non-residential building work done by the private sector in the quarter, in thousands of dollars.
value_of_work_done_chain_volume_measures_private_s_3
Private sector total building work done
$'000Real value of all building work (residential and non-residential) done by the private sector in the quarter, in thousands of dollars.
value_of_work_done_chain_volume_measures_private_s_4
Private sector engineering construction work done
$'000Real value of engineering construction work done by the private sector in the quarter, in thousands of dollars.
value_of_work_done_chain_volume_measures_private_s_5
Private sector non-residential construction work done
$'000Real value of non-residential construction (non-residential building plus engineering) done by the private sector in the quarter, in thousands of dollars.
value_of_work_done_chain_volume_measures_private_s_6
Private sector total construction work done
$'000Real value of all construction work done by the private sector in the quarter, in thousands of dollars.
value_of_work_done_chain_volume_measures_public_se
Public sector residential building work done
$'000Real value of residential building work done by the public sector in the quarter, in thousands of dollars.
value_of_work_done_chain_volume_measures_public_se_2
Public sector non-residential building work done
$'000Real value of non-residential building work done by the public sector in the quarter, in thousands of dollars.
value_of_work_done_chain_volume_measures_public_se_3
Public sector total building work done
$'000Real value of all building work done by the public sector in the quarter, in thousands of dollars.
value_of_work_done_chain_volume_measures_public_se_4
Public sector engineering construction work done
$'000Real value of engineering construction work done by the public sector in the quarter, in thousands of dollars.
value_of_work_done_chain_volume_measures_public_se_5
Public sector non-residential construction work done
$'000Real value of non-residential construction (non-residential building plus engineering) done by the public sector in the quarter, in thousands of dollars.
value_of_work_done_chain_volume_measures_public_se_6
Public sector total construction work done
$'000Real value of all construction work done by the public sector in the quarter, in thousands of dollars.
value_of_work_done_chain_volume_measures_total_sec
Total sectors residential building work done
$'000Real value of residential building work done by private and public sectors combined in the quarter, in thousands of dollars.
value_of_work_done_chain_volume_measures_total_sec_2
Total sectors non-residential building work done
$'000Real value of non-residential building work done by both sectors combined in the quarter, in thousands of dollars.
value_of_work_done_chain_volume_measures_total_sec_3
Total sectors total building work done
$'000Real value of all building work done by both sectors combined in the quarter, in thousands of dollars.
value_of_work_done_chain_volume_measures_total_sec_4
Total sectors engineering construction work done
$'000Real value of engineering construction work done by both sectors combined in the quarter, in thousands of dollars.
value_of_work_done_chain_volume_measures_total_sec_5
Total sectors non-residential construction work done
$'000Real value of non-residential construction (non-residential building plus engineering) done by both sectors combined in the quarter, in thousands of dollars.
value_of_work_done_chain_volume_measures_total_sec_6
Total sectors total construction work done
$'000Real value of all construction work done by both sectors combined in the quarter, in thousands of dollars.

Data source: ABS