Bridges and Culverts in the Australian Capital Territory
Point locations of 1,317 bridges, culverts, footbridges and tunnels across the Australian Capital Territory, each with structural attributes such as type, materials, length, width, spans, clearance, load standards and operational state. Callers get the features per suburb as GeoJSON or those near an address.
Endpoints
Bridges and Culverts in the Australian Capital Territory (map)
/v1/suburbs/{suburb_name}/layers/act-bridges-and-culverts10¢ per call| Query parameter | Description |
|---|---|
fields | Comma-separated field slugs (below). Omit for all. |
limit | Features per page, 1 to 500 (default 200). |
offset | Items to skip, for the next page (`next_offset`). |
curl -X GET 'https://api.microburbs.com.au/v1/suburbs/Kambah/layers/act-bridges-and-culverts' \
-H 'Authorization: Bearer test'test is the public sandbox key: it works only for the sandbox's allowlisted suburbs and addresses. Use your own key for anything else.
Bridges and Culverts in the Australian Capital Territory nearby
/v1/properties/{gnaf_id}/layers/act-bridges-and-culverts/nearby10¢ per call| Query parameter | Description |
|---|---|
radius_m | Search radius in metres, 1 to 2000 (default 500). |
fields | Comma-separated field slugs (below). Omit for all. |
limit | Features per page, 1 to 500 (default 200). |
offset | Items to skip, for the next page (`next_offset`). |
curl -X GET 'https://api.microburbs.com.au/v1/properties/GAACT714845944/layers/act-bridges-and-culverts/nearby' \
-H 'Authorization: Bearer test'test is the public sandbox key: it works only for the sandbox's allowlisted suburbs and addresses. Use your own key for anything else.
About this dataset
The whole Australian Capital Territory, from about longitude 148.83 to 149.39 and latitude -35.89 to -35.14. It has 1,317 features, all inside a suburb or district area, including the rural districts listed as ACT Remainder areas such as Belconnen, Booth, Canberra Central, Coree, Cotter River, Gungahlin, Hall, Jerrabomberra, Kowen and Majura. The data has been current since April 2026. Current to 2026-09-30; refreshed As published, with no fixed update schedule..
What it is
A point layer of road, pedestrian, light rail and animal-crossing structures in the ACT. Each feature is one structure, identified by an asset ID, with a name, location description, suburb and a detailed engineering record.
What it shows
It shows where bridges and culverts sit, what they cross (road, water, floodway, footpath, ground), and how they are built: asset sub type, superstructure and deck materials, dimensions, number of spans, piers, joints and abutments, and design and current load standards. It also records the road network type and operational state (active, proposed or in consolidation).
Why use it
Useful for infrastructure risk and flood-exposure screening, due diligence near a site, transport and freight route checks, and asset analysis by suburb. Clearance, load limit and standard fields help assess access for heavy or tall vehicles.
How it is built
We load the asset records as map points and index them by suburb and by distance from an address. Attribute values are kept as supplied, in upper case, and many engineering fields are sparsely filled. Structures owned or managed privately, by other agencies or by the Commonwealth may be missing.
Shortcomings
- Many engineering fields are mostly blank: superstructure type is empty for 92% of rows, and superstructure material, wearing surface and approach alignment are each empty for about a third. Treat blanks as unknown, not as none.
- Some numeric values look implausible, for example a structure length up to 12,550 m, a width up to 964 m and a minimum clearance up to 2,500 m. These are probably entry or unit errors, so check outliers before using them.
- Structures owned or managed privately, by other agencies or by the Commonwealth may not be included, so the layer is not a full inventory of crossings in the ACT.
- Span length is free text (for example 2*12.99/26.99) and must be parsed. Text values are upper case and vary in style.
Fields
| Field | Unit | Description |
|---|---|---|
idRecord ID | Unique identifier of the row in the dataset. | |
versionRecord version | Version identifier of the row, which changes when the record is revised. | |
created_atRecord created | Date and time the row was first created in the dataset, in UTC. | |
updated_atRecord updated | Date and time the row was last updated in the dataset, in UTC. | |
asset_typeAsset type | Broad class of the structure, either bridge or culvert. | |
asset_sub_typeAsset sub type | More specific structure form, such as concrete slab, box culvert, footbridge, stock movement tunnel or steel pipe culvert. | |
asset_idAsset ID | Asset identifier for the structure, in a form like BRID5127. | |
asset_nameAsset name | Descriptive name of the structure, usually combining road, suburb and what it crosses. | |
locationLocation description | Text description of where the structure is, such as a street name or block reference. | |
function_typeFunction | Main use of the structure, such as road bridge, pedestrian bridge or animal crossing. | |
superstructure_materialSuperstructure material | Main material of the superstructure, such as steel or prestressed concrete; blank for 31% of rows. | |
superstructure_typeSuperstructure type | Structural form of the superstructure, such as truss, slab, box girder or beam girder; blank for 92% of rows. | |
deck_materialDeck material | Material of the deck, such as reinforced concrete, steel or fibre reinforced plastic. | |
wearing_surfaceWearing surface | Surface layer that traffic runs on, such as asphalt, gravel, timber or concrete; blank for 31% of rows. | |
structure_lengthStructure length | m | Overall length of the structure in metres. |
structure_length_unitStructure length unit | Unit for structure length, always metre. | |
structure_widthStructure width | m | Overall width of the structure in metres. |
structure_width_unitStructure width unit | Unit for structure width, always metre. | |
road_approach_alignmentRoad approach alignment | Shape of the road approach to the structure: straight, curved or skewed; blank for 33% of rows. | |
number_of_lanesNumber of lanes | count | Number of traffic lanes carried on the structure. |
carriageway_widthCarriageway width | m | Width of the carriageway in metres; blank for 91% of rows. |
carriageway_width_unitCarriageway width unit | Unit for carriageway width, always metre. | |
skew_angleSkew angle | degrees | Angle between the structure and the line it crosses, in degrees; blank for 95% of rows. |
skew_angle_unitSkew angle unit | Unit for skew angle, always degrees. | |
posted_speed_limitPosted speed limit | km/h | Posted speed limit on the structure, between 20 and 100. |
number_of_footpathsNumber of footpaths | count | Number of footpaths on the structure, from 0 to 4. |
left_footpath_widthLeft footpath width | m | Width of the left-hand footpath in metres; blank for 94% of rows. |
left_footpath_width_unitLeft footpath width unit | Unit for left footpath width, always metre. | |
right_footpath_widthRight footpath width | m | Width of the right-hand footpath in metres; blank for 97% of rows. |
right_footpath_width_unitRight footpath width unit | Unit for right footpath width, always metre. | |
barrier_railing_typeBarrier or railing type | Type of traffic barrier or railing, such as steel, flexbeam guardrail or none; blank for 91% of rows. | |
pedestrian_barrier_typePedestrian barrier type | Type of pedestrian barrier, such as pipe protective barrier or galvanised pipe and chain wire; blank for 99% of rows. | |
crossingCrossing | What the structure crosses, such as road, floodway, footpath, ground or water. | |
crossing_typeCrossing type | What the structure carries and what it crosses, such as road over road or pedestrian path over water. | |
minimum_clearanceMinimum clearance | m | Minimum clearance under the structure in metres; blank for 33% of rows. |
minimum_clearance_unitMinimum clearance unit | Unit for minimum clearance, always metre. | |
design_standardDesign standard | Load standard the structure was designed to, such as H20-44 or HS20-44. | |
current_standardCurrent standard | Load standard the structure is currently assessed against, such as SM1600, T44 or MS18. | |
posted_load_limitPosted load limit | tonne | Posted load limit in tonnes, present for only about 1% of rows. |
posted_load_limit_unitPosted load limit unit | Unit for posted load limit, always tonne. | |
median_heightMedian height | m | Height of the median barrier in metres; blank for 99% of rows. |
median_height_unitMedian height unit | Unit for median height, always metre. | |
median_widthMedian width | m | Width of the median in metres; blank for 99% of rows. |
median_width_unitMedian width unit | Unit for median width, always metre. | |
number_of_spansNumber of spans | count | Number of spans in the structure, from 1 to 44. |
span_lengthSpan length | Span length or lengths in metres, held as text and sometimes a pattern such as 3*8 or 2*12.99/26.99. | |
span_structural_actionSpan structural action | How the spans carry load, such as continuous, cable stayed or simply supported; blank for 48% of rows. | |
span_structural_descriptionSpan structural description | Short text describing the span form, such as beam or concrete box culvert; blank for 80% of rows. | |
number_of_piersNumber of piers | count | Number of piers supporting the structure, from 1 to 68. |
pier_typePier type | Form of the piers, such as single column, dual column or blade (walled); blank for 97% of rows. | |
pier_foundation_typePier foundation type | Foundation under the piers, such as piles, caissons or spread footing; blank for 97% of rows. | |
pier_materialPier material | Material of the piers, such as reinforced concrete, steel or timber; blank for 87% of rows. | |
number_of_jointsNumber of joints | count | Number of expansion or other joints in the deck, from 1 to 33; blank for 80% of rows. |
joint_type_abutment_1Joint type at abutment 1 | Type of deck joint at the first abutment, such as pourable seal or sawcut joint. | |
joint_action_abutment_1Joint action at abutment 1 | Whether the joint at the first abutment is expansion or fixed. | |
joint_type_abutment_2Joint type at abutment 2 | Type of deck joint at the second abutment, such as pourable seal or polymer nosing joint. | |
joint_action_abutment_2Joint action at abutment 2 | Whether the joint at the second abutment is expansion or fixed. | |
number_of_abutmentsNumber of abutments | count | Number of abutments, either 1 or 2; blank for 93% of rows. |
abutment_typeAbutment type | Construction of the abutments, such as reinforced concrete, masonry or brick, or selected backfill. | |
abutment_foundation_typeAbutment foundation type | Foundation under the abutments, such as bedrock, spread footing, piles or caissons. | |
bearing_typeBearing type | The type of structural bearing supporting the bridge deck, such as bronze plate, strips, pot or mortar pad, left empty for about 85% of features. | |
bearing_quantityBearing quantity | each | The number of bearings of the recorded type on the structure, ranging from 1 to 55, and empty for about 85% of features. |
bearing_quantity_unitBearing quantity unit | The unit of measure for the bearing quantity, recorded as "Each", and empty for about 85% of features. | |
culvert_cell_widthCulvert cell width | mm | The internal width of a single culvert cell, with recorded values from 2100 to 3600 millimetres, and empty for nearly all features. |
culvert_cell_width_unitCulvert cell width unit | The unit of measure for the culvert cell width, recorded as "Millimetre", and empty where no width is given. | |
culvert_cell_heightCulvert cell height | mm | The internal height of a single culvert cell, with recorded values from 750 to 1200 millimetres, and empty for nearly all features. |
culvert_cell_height_unitCulvert cell height unit | The unit of measure for the culvert cell height, recorded as "Millimetre", and empty where no height is given. | |
number_of_cellsNumber of cells | each | The count of parallel cells (barrels) in a multi-cell culvert, recorded as 2 or 3, and empty for nearly all features. |
number_of_cells_unitNumber of cells unit | The unit of measure for the number of cells, recorded as "Each", and empty where no cell count is given. | |
road_network_typeRoad network type | The road network classification of the route the structure serves, such as arterial, municipal, pedestrian or future B-double network, empty for about 1% of features. | |
suburbSuburb | The Australian Capital Territory suburb or district in which the structure is located, such as Fadden, Giralang, Stirling or Casey, given in uppercase. | |
addressAddress | The uppercase text address of the structure, usually a street name where known plus suburb or district, state, postcode and country, for example "ISABELLA DRIVE,CHISHOLM,ACT,2905,AUSTRALIA". | |
ownershipOwnership | The body that owns the structure, recorded as "ROADS ACT" in the examples. | |
maintained_byMaintained by | The maintenance group responsible for the structure, recorded as "RM - BRIDGES" in the examples. | |
operational_stateOperational state | The current lifecycle status of the structure, such as active, in consolidation or proposed. |
